The value of the contract is about 1.6 million euros, and it will be executed over a period of eleven months.The assignment comprises a 2.5 tons per hour crude tall oil plant with auxiliaries based on the HDS (Hydro Dynamic Separation) technology, which is Pöyry´s proprietary know-how. Similar technology based equipment has already been installed in the 20 most modern pulp mills in Europe, USA, Canada and China.Zellstoff Pöls is a member of the Heinzel Group, and the mill is the largest manufacturer of elementary chlorine-free (ECF) bleached softwood sulphate pulp in Central Europe. The mill employs 380 people and has a capacity of 400 000 tons per year.
Annons Annons AnnonsPöyry awarded tall oil plant contract in Austria
Sept 29 2010 Pöyry has been awarded the engineering, procurement and construction contract for a tall oil plant by Zellstoff Pöls AG in Austria.
Annons